DTNA Considers Texas for Its Largest U.S. Manufacturing Plant

DTNA weighs Texas option for largest U.S. truck plant

Daimler Truck North America is still evaluating several locations for a planned manufacturing facility that the company says would become the largest truck production plant in the United States.

A site in Caldwell County, Texas, remains under consideration, according to the city of San Marcos. The city said it is the only Texas location still in the running. A DTNA spokesman confirmed in an email that the company continues to assess locations in multiple states, including Texas, as its target to begin construction by the end of 2026 approaches.

The proposed Caldwell County development, referred to as Project Hercules, would cover about 611 acres. The San Marcos City Council is scheduled to consider a proposed agreement on first reading Dec. 1 and on second reading Dec. 15.

DTNA has not announced a final location or provided a specific timetable for selecting the site. Company officials have said they are weighing locations based on access to a stable supply chain, a skilled workforce, transportation and logistics infrastructure, business conditions and alignment with DTNA’s manufacturing strategy.

“It will be the largest manufacturing plant in the U.S. for trucks when all is said and done,” DTNA President and CEO John O’Leary said previously.

Carolina region remains a strong candidate

While Texas remains under consideration, the southeastern United States — particularly the Carolinas — is viewed as a strong candidate because of DTNA’s existing manufacturing presence in the region.

North Carolina has long been an important production center for Freightliner. DTNA operates plants in Cleveland, Mount Holly and Gastonia, all in the state. The Mount Holly facility opened in 1979 and has been part of the company’s production network for decades.

That existing footprint could support the company’s goal of optimizing production across its manufacturing network. DTNA has also said the new facility would incorporate more automation than some of its current assembly plants.

Daimler Truck announced plans for the new facility in early August, citing expected growth in truck demand in the United States and Canada. The company set an expedited goal of starting construction by the end of 2026.

At an event ahead of the IAA Transportation conference in Hannover, Germany, Daimler Truck CEO Martin Daum said the company had narrowed the search to a few sites and hoped to make a decision soon.

Production changes extend beyond the new plant

The proposed facility is part of a broader effort by Daimler Truck to reorganize its North American production and distribution network. DTNA is the parent company of Freightliner, Western Star and Thomas Built Buses.

The company recently announced that remaining Freightliner and Western Star truck production would move away from Portland, Oregon, to East Coast and Carolina facilities by the end of the year. DTNA said the decision to discontinue truck manufacturing in the Pacific Northwest is separate from the proposed new plant.

Freightliner was founded in Portland in 1942, and Daimler Truck has maintained its North American headquarters there since acquiring the brand in 1981. The company’s Portland Truck Manufacturing Plant has operated since 1969 and currently builds Freightliner eCascadia and eM2 battery-electric trucks, along with Western Star X-Series models.

DTNA also plans to close its Swan Island plant in Portland on Oct. 30. The closure would end Freightliner manufacturing in the city for the first time since 1947. Company officials have said headquarters and other Portland operations will remain in place.

The Portland changes are part of a larger manufacturing strategy that includes shifting production and increasing automation. DTNA has also said the company is adjusting its distribution network to improve efficiency and respond to regional demand.

Distribution network is also being reshaped

DTNA plans to close its parts distribution centers in Phoenix and Reno, Nevada, in 2026 and 2027, respectively. The Phoenix operation will be replaced by a facility in Las Vegas, while the Reno operation will be replaced by a facility in Portland.

DTNA currently operates 11 parts distribution centers, including 10 in the United States and one in Canada. The company said the changes are intended to address significant growth in parts sales on the West Coast, particularly in the Pacific Northwest.

According to DTNA, the replacement facilities should help shorten delivery times, improve service levels and better align operations with regional demand. For fleets and drivers, the changes could affect how quickly replacement parts move through the company’s distribution system, although DTNA has not provided details on specific service changes tied to the proposed manufacturing plant.

The location of Project Hercules will determine how the company adds capacity while reorganizing existing facilities. For now, Caldwell County remains a contender, but DTNA continues to evaluate sites in several states and has not committed to Texas.

Similar Posts

Leave a Reply